765 kV substation reactor and transformer bay, with bushings, gantries and transmission towers behind

Electrical Engineering

Electrical engineering,feasibility to energisation

Consultancy, design and drawing, erection, testing and commissioning, retrofitting and energy audits — carried out by the engineers who draw the scheme.

Plants Consultancy

Electrical consultancy for industrial plants, from feasibility through to energisation.

Coal washery under construction, conveyor galleries and structural steel going up

We take on the electrical scope of a plant as a whole: load lists and demand assessment, incoming supply and transformer sizing, distribution architecture, protection philosophy and earthing. Where a scheme already exists we review it against the load as it stands today rather than as it was designed, and say plainly where it no longer holds.

  • Load assessment, demand factors and transformer sizing
  • HT and LT distribution architecture, and the single line that follows from it
  • Protection philosophy and co-ordination, modelled in ETAP
  • Earthing and lightning protection design, backed by soil resistivity measurement
  • Specifications and technical evaluation for tendering
  • Site supervision, and witness of testing where you want a second pair of eyes

Industries we work in

  • Substations (AIS & GIS)
  • Hydro Power (Small & Micro)
  • Steel Plants
  • Oil & Gas
  • Material Handling
  • Coal Washery
  • Process Plants
  • Water Treatment
  • Cement
  • Chemical & Fertilizer
  • Pharmaceutical
  • Ferro Alloy
  • Foundry
  • Cranes (EOT, RTG, Goliath)

Hydropower Consultancy

Electrical and control engineering for small and micro hydro, including remote sites.

Hydro turbine in a power house — spiral casing, main inlet valve and the governor oil system alongside

Generator, governor, excitation and switchyard treated as one system, because on a small hydro set they behave as one. We have commissioned plants at sites in Ladakh and Arunachal Pradesh, where a return visit is measured in days, so the commissioning plan and the spares list matter as much as the drawings.

  • Generator protection, excitation and automatic voltage regulation
  • Turbine governor interfacing and unit control
  • Switchyard layout, protection and metering
  • Station auxiliaries: LT distribution, DC systems, battery and charger sizing
  • Synchronising and grid interface
  • Commissioning at remote sites, planned around the access you actually have

Electrical Design & Drawing

Substations up to 765 kV, hydro power, coal washeries, material handling and process plants.

AutoCAD electrical layout of a 33/6.6 kV main substation, with cable trench sections and an equipment schedule

Layouts, schematics, calculations and protection schemes, issued as a package a contractor can build from, an inspector can approve and your own maintenance team can still read in ten years. The calculations are shown, not just their results, so the basis of a decision can be checked rather than taken on trust.

  • Substations up to 765 kV, air and gas insulated
  • Hydro power, coal washery, material handling and process plant electrical design
  • ETAP power system modelling and full protection co-ordination
  • Numerical relay settings, issued as a schedule ready to apply
  • Drawings revised and reissued as site conditions change

What a design package contains

  • Protection & metering SLD
  • LT AC & DC distribution SLD
  • Electrical layout — plan & section
  • Cable trench & tray layout with BOM
  • Earthing calculation & layout
  • Lightning protection calculation
  • Illumination calculation
  • Cable schedule & interconnection
  • HT & LT cable sizing with voltage drop
  • Transformer sizing
  • CT knee point voltage
  • Battery & charger sizing
  • Sag & tension calculation
  • Short circuit force calculation
  • ETAP power system modelling
  • Full protection co-ordination study
  • Numerical relay setting
  • I/O list for PLC & SCADA

Switchyard Design, Testing & Commissioning

Switchyards from 11 kV to 765 kV — bay layout and protection through to charging and handover.

EHV switchyard looking down the central roadway — line gantries, strung busbars, isolators and current transformers running away to the control building

A switchyard is where a plant meets the grid, and it is judged on two days: the day it is charged and the day it has to clear a fault. We take it from bay layout and clearances through busbar scheme, protection and earth mat, then stay on site for erection, pre-commissioning and charging. Air-insulated or gas-insulated, a new yard or an extension into one that cannot be shut down, the engineering is the same in kind — what changes is how the outage is planned.

  • Bay layout, phase and section clearances, and structure loading
  • Busbar scheme — single, main and transfer, or double bus — chosen against the duty, not by habit
  • Protection, metering and control schemes, with relay settings issued as a schedule
  • Earth mat designed from measured soil resistivity, with step and touch potential checked
  • Erection and pre-commissioning of isolators, breakers, CTs, PTs, CVTs and lightning arrestors
  • Charging, load trials and documented handover — including extensions worked into a live yard

Switchyards we take on

  • 11 kV
  • 33 kV
  • 66 kV
  • 132 kV
  • 220 kV
  • 400 kV
  • 765 kV
  • Air-insulated (AIS)
  • Gas-insulated (GIS)
  • Hybrid switchgear
  • Line, transformer & bus-coupler bays
  • Extension of a live yard
  • Earth mat & lightning protection
  • Yard illumination & LT auxiliaries

Erection, Testing & Commissioning

Supply, installation, testing and commissioning of complete electrical projects.

Gas-insulated switchgear bay being erected indoors, with its local control cubicles alongside

Our own engineers on site, through to energisation and handover. Where you already have an erection contractor we supervise instead, which usually costs less and keeps your existing arrangements intact. Testing is done with our own instruments and reported with the readings, not a pass mark.

  • Erection and installation of HT and LT systems, or supervision of your contractor
  • Pre-commissioning checks, loop checking and functional testing
  • Routine and special testing of transformers, switchgear, breakers and relays
  • Protection relay testing and calibration against the approved settings
  • Energisation, load trials and documented handover
  • Relays integrated into your existing SCADA, or a new one

Equipment we test

  • Power & distribution transformers
  • GIS switchgear
  • AIS switchgear
  • VCB, ACB & SF6 breakers
  • Changeover switches
  • Numerical & electromechanical relays
  • CTs, PTs & CVTs
  • Lightning arrestors
  • Generators & motors
  • Isolators & transducers
  • Relay & metering panels
  • Busbars & cables

Panel Retrofitting

Ageing panels and systems brought back into service, co-ordinated for the load as it is today.

Control and relay panel front for 33 kV feeder bays, carrying numerical relays and annunciators

Panels outlive the plant they were designed for. Rather than replace a sound enclosure, we replace what has aged inside it — electromechanical relays for numerical, obsolete breakers for current equivalents, wiring and terminations where they no longer meet the duty — and reissue the schematics so the drawings match the panel again.

  • Electromechanical relays replaced with numerical, with fresh settings
  • Obsolete breakers and contactors replaced with current equivalents
  • Re-wiring, re-termination and labelling to match the revised scheme
  • Modified schematics and a fresh co-ordination study for today's load
  • Communication added so an old panel reports into SCADA
  • Carried out in shutdown windows, planned around your outage

Energy Audit & Site Testing

Measurement-based audits, diagnostics and condition testing — plus feasibility reports and spares.

Engineer on site running an earth resistance test with a portable tester, spikes driven into the ground and test leads run out across the works

An audit that is worth acting on rests on measurement rather than nameplate data. We log the load, measure power factor and harmonics where they matter, thermograph the joints that are actually running warm, and report what a change would save against what it would cost. Condition testing on transformers and switchgear is reported the same way.

  • Load logging, power factor and harmonic measurement
  • Thermography of joints, terminations and switchgear under load
  • Transformer condition testing: tan-delta, SFRA, partial discharge, oil filtration
  • Soil resistivity testing and earth resistance measurement
  • Feasibility reports with costed recommendations
  • Supply of electrical spares

Test instruments we work with

  • Omicron CMC 256 Plus
  • Omicron CMC 356
  • ISA relay test kit
  • ELCID
  • Digital RSO
  • Partial Discharge
  • Tan-Delta
  • SFRA
  • CT Analyzer
  • PT Analyzer
  • VIDAR
  • DCRM (EHV breakers)
  • Thermal imaging
  • Power analyzer
  • Dew point measurement

Tell us what the plant needs

Send the single line, the load list, or just the problem. One of our engineers will come back to you.

Talk to our engineers
Electrical Services — INVENIA SYSTEMS